Major projects completed by „Chimremontstroi” JSCo.
Employer Contractor or Subcontractor Project Description Year
I Metallurgy
1 Stomana Industry JSC – Pernik Main Subcontractor Air Liquide – France Main Heat Exchanger and lining of pumps on the territory of Stomana Industry – town of Pernik The project includes: preparation of detailed drawings for part: Civil construction – fabrication of metal structures to Heat Exchanger and installation of equipment. 2007
2 Cumerio Med – Pirdop Main Contractor Investment Project IN 141 Evaporation Cooler after 2nd Converter in Metallurgical Production Plant - Design;Dismounting; Fabrication and Delivery: Steel structures, Evaporation Cooler, Gas ducts, Delivery of Electrical materials and Instrumentation Equipment; Installation. 2005
3 Cumerio Med – Pirdop Main Contaractor Design, fabrication, delivery and erection of Project IN 152 – Modernisation of Sulphur Acid Production Line 2, New absorption department. 2006-2007
3 Cumerio Med – Pirdop Main Contractor Design, fabrication, delivery and erection of stainless steel tanks with agitators for New Refinery in Cumerio Med AD – Pirdop, Project IN 160 2007-2008
4 Cumerio Med – Pirdop Main Subcontractor AIR LIQUIDE Bulgaria Ltd. Replacement of an Air Compressor – Civil and Structural, including detail design, construction and erection/installation works 2005-2006
5 Sofia Med JSC – Sofia Main Contractor Machine installation works for Slitting line ASMAG, Cooling tunnel KURBEL, New Grinding machine for Rolling Mill, new water pipelines, civil works, fabrication and installation of the Building of the Physical & Chemical Plant, foundation for Dedust 2003-2005
6 Sofia Med JSC – Sofia Main Contractor Civil and construction works, reconstructions, new roller lines, annealing lines 2006
7 Kremikovtzi JSC – Sofia Main Contractor Sintering Plant – Hopper Bridge, Excavation, concrete works, reinforcement. Fabrication and installation of steel structures 2002-2003
8 Kremikovtzi JSC – Sofia Main Contractor Construction of radiants 2005
9 Kremikovtzi JSC – Sofia Main Contractor Reconstruction of waste water boiler – Preparation of detail documentation and civil construction works. 2006
10 Chelopech Mining JSC Main Contractor Floatation Pruduction - Delivery and instalation 2007-2008
11 Chelopech Mining JSC Main Contractor Paste plant Project- Supply and installation of dump valve assemblies 2010
II Cemical Industry
1 Energia JSC – Targoviste SubcontractorTangra Ltd Stack for Workshop К-23А - Design, construction and mounting 2008
III Petrochemical Industry
1 Lukoil Neftochim Burgas JSC Main Contractor Shell&Tube Heat Exchangers 15 pcs. /Е-01 А/В/С, Е-02 А/В/С, Е-03, Е-06, Е-07, Е-08, Е-09, Е-11, Е-12 А/В/С, Е-13, Е-14, Е-15, Е-17, Е-18, Е-19/ with spare parts for 2 years operation for sulphur acid alkylation. The delivery scope includes engineering, fabrication and delivery at site. The Heat Exchangers are designed and fabricated in compliance with standards ASME and TEMA. 2006-2008
2 Lukoil Neftochim Burgas JSC Main Contractor Debutanisator Т02 – 1 pcs. and Depropanisator Т03 – 1 pcs. for sulphur acid alkylation. The delivery scope includes engineering, fabrication and delivery at site. The Columns are designed and fabricated in compliance with standard ASME BPVC, part VIII, section 1. 2006-2008
3 Lukoil Neftochim Burgas JSC Main Contractor Revamp of AD-5 and VDM-1 in AVD-1. Shell&Tube Heat Exchangers – 4 pcs. NT-137 А/B; NT 138 A/B. The delivery scope includes engineering, fabrication and delivery at site.The Heat Exchangers are designed and fabricated in compliance with standard ASME BPVC, part VIII, section 1. 2007-2008
4 Lukoil Neftochim Burgas JSC Main Contaractor Column C – 501 for Regeneration Unit MDEA, includes engineering, fabrication and delivery at site. 2008-2009
5 Lukoil Neftochim Burgas JSC Main Contractor Heat Exchangers Е-501; Е 502 А/B/C; Е-504, includes engineering, fabrication and delivery at site. 2008-2009
6 Lukoil Neftochim Burgas JSC Main Contractor Tank Т-501 (September 2008 – till present), includes engineering, fabrication, delivery and assembly. 2008-2009
IV Cement Industry
1 Titan – Zlatna Panega Main Contractor Reconstruction of cement plant "Тitan" Zlatna Panega. 2006
V Mining
1 TPP Maritsa East 2 Main Contractor Delivery of bumper and raker for powder mixing systems 2005
2 TPP Maritsa East 2 Main Subcontractor FAM Bulgaria Fabrication, delivery and erection of 3 limestone silos, metal structure (platform) and Bucket Elevator Tower for Desulfurisation Plant in TPP Maritsa East 2 2006-2007
VI Power Generation
1 National Electricity Company EAD – Branch Rhodope Group WPS Main Contractor Detailed Engineering, Fabrication, Delivery, Installation, Setting and Commissioning for Project Toshkov Chark Pump Station 2004-2005
2 National Electricity Company EAD – Branch Rhodope Group WPS Main Contractor Project for delivery of Vertical Lathe and commissioning 2005-2006
3 National Electricity Company EAD – Branch WPS Rila Group Main Contractor Detailed Engineering, Fabrication and Delivery of 40 water oil catchers of HG1 and HG2 of Momina Klisura WPS 2004-2005
4 TPP Maritsa East 1 Subcontractor Alstom - Italy Erection of absorbers and tanks. Wet Flue Gas Desulf Plant (WFGD Project) Fabrication and erection of 2 absorbers – tower-like equipment with diameter at base 21м and height 51м 2007-2009
5 TPP Maritsa East 2 Subcontractor Alstom - Germany Project for: Lot 1 – Ash conveyor. Bearing metal structure for chain conveyor, transporting ash from coal burning, preparation of detail drawings, fabrication and erection of metal structure. Lot 2 – Metal supports for ducts. Lot 3 – Metal structures for auxiliary boiler. Preparation of detail design, fabrication, erection. 2008-2010
6 TPP Bobov dol Main Contaractor Steam moisturisers - Design and construction 2008-2009
7 Ekoproekti Ltd. Main Contaractor Steam boiler building with fuel facilites PK 4 - Town of Dimovo Construction and mounting of steel structure, installation of boiler 2008-2009
VII Ecology
1 Consortium for energy efficiency Main Contractor Performing civil and construction works for highly efficient rehabilitation and isolation of school buildings in Bulgaria, Lot 2 – Central region- towns of Lovech, Pleven, Haskovo 2005
VIII Civil Construction
1 SID PAK - Bulgaria Main Contractor Repair – civil works on the building of Repair plant Iliyantzi – Sofia. 2006
2 Dana Ltd. Contractor „Furniture house” – town of Vratza - Design of conceptual, technical and detail project. Fabrication of metal structures, civil and structural works. 2007 –
IX Others
1 Stomana Industry JSC – Pernik Main Subcontractor Prosal Tubes S.A. Production Plant for Cold Bent Tubes on the territory of Stomana Industry – town of Pernik, Investor: Prosal Tubes S.A. – design and construction. Modification of existing building into production hall for fabrication of cold bent tubes. 2006-2007
2 Stomana Industry JSC – Pernik Main Contaractor Assembly of installation for production and cold bending of reinforced mesh in the existing production building of the workshop for ore support elements on the territory of Stomana Industry – design. The design includes preparation of following parts: Technological, Water Supply and Sewerage, Electrical, Civil and Structural, HVAC and heat-technical efficiency. 2007
3 ALSTOM – Sweden Main Contractor Fabrication of gas duct parts 2005
4 Progeco – Bulgaria Main Contractor Construction of radiants 2005
5 Agriko Bulgaria Ltd. Main Contractor Modification of existing building into storehouse and line for processing of potatoes. Design and Construction. 2005-2006
6 KOCH – Germany Main Contractor Fabrication of metal structures for tube conveyors 2005-2006
7 ALSTOM – Norway Main Contractor Production of metal structures for gas ducts 2006-2007
8 ALSTOM – Finland Main Contractor Fabrication of steel elements, gas ducts for electric precipitator filters for Spain. 2007-2008
9 Chimiplast Ltd. Contractor Project: Modification of existing production building into „Plant for production of polyethylene and polypropylene pipes” – town of Vratza - Design and Civil Construction 2007-2008
10 Micromet Ltd – Belene Main Contractor Modification of existiong workshop for painting into workshop for stamping - town of Belene Project "Beautiful Bulgaria" 2008-2009
11 TPP Maritsa East 2 Main Contractor "Supply of welding fixing straps and binder for filling" 2010